Materials TEC
The 16,200-square-foot facility at 80 Boulderbrook Circle in Lawrenceville, GA, was redesigned for Materials Tec to support efficient logistics and warehouse operations with a modernized layout and flexible infrastructure. Wolf Engineering provided comprehensive MEP design services, including electrical systems to power industrial equipment and warehouse lighting, HVAC systems for climate control across working areas, and plumbing solutions tailored for utility access, employee use, and maintenance. These integrated systems ensure reliable performance and long-term adaptability for the facility’s evolving operational demands.