SP Meditec
SP Meditec transformed a 57,000-square-foot warehouse in Peachtree City, Georgia, into a state-of-the-art plastic manufacturing facility focused on healthcare injection mold solutions. The project included a white production space and a Class 8 clean room with advanced HVAC systems to maintain strict environmental controls. Wolf Engineering provided full MEP design services, delivering robust power infrastructure to support high-capacity equipment such as injection molding machines, industrial chillers, and air compressors. Our team engineered tailored mechanical, electrical, and plumbing systems to ensure precision, efficiency, and compliance with the facility’s demanding operational requirements. This project demonstrates Wolf Engineering’s expertise in creating innovative MEP solutions for specialized industrial environments.